You're about to place a $30,000 purchase order with a factory you've never visited.

The samples were good. The price is right. The sales rep is responsive. So what could go wrong?

A lot — and almost all of it is discoverable before you pay a deposit, if you know what to check. Below are the five checks our team runs on every factory audit in China, illustrated with photos from a real visit to an outdoor-furniture factory in Foshan.

Print the checklist at the end. Or better — have someone run it for you.

1. The gate test: is this business real?

Outdoor furniture factory exterior in Foshan, China


The factory gate in Foshan. Before anything else, we confirm the business licence, the registered address, and the export history — then verify them against what's physically in front of us.

How we check it: Business licence number vs. the national enterprise credit system. Export customs records. Then: does the name on the gate match the name on the contract?

🚩 Red flag: The “factory” is reluctant to share its licence, or the address on paper is an office building with no production lines.

Cost of skipping: You contract with a trading company posing as a factory. Your order gets subcontracted to an unknown workshop. When defects appear, nobody takes responsibility.

2. The capacity check: can they actually make your order?

Kitchen appliance production line at full capacity


A production line in full swing. Headcount, skill level, and line organisation tell us more than any sales deck: can this factory deliver 5,000 units on your timeline — or will your order quietly go elsewhere?

How we check it: Count workers on the line. Ask what else is in production. Compare open capacity against your PO quantity and deadline. Check whether key processes are in-house or outsourced.

🚩 Red flag: A 20-person workshop accepting a 10,000-unit order with a 30-day lead time. The maths doesn't work — which means subcontracting.

Cost of skipping: Six-week delays. Quality that varies unit to unit. A launch date you can't hit.

3. The workmanship check: where the defects hide

Close-up of a weld joint on an aluminium furniture frame


A weld joint, up close. On outdoor furniture this is where 90% of rust complaints begin. We check weld consistency across random units — not just the perfect sample they mailed you.

Close-up of rattan weave tension checked during quality control


Weave tension on a rattan chair. Uneven tension looks fine in the showroom and loosens within months on a customer's patio. We measure it against the sealed golden sample, mid-production, while rework is still cheap.

How we check it: AQL random sampling during production (not after). Measurements, function tests, and finish checks against the golden sample selected at the showroom stage.

🚩 Red flag: The factory resists mid-production inspections, or “the line is too busy for visitors this week.”

Cost of skipping: You find the defect when the container lands in Brisbane. Rework in Australia costs 5–10x what it costs at the factory — if rework is even possible.

4. The materials check: what becomes a warranty claim

Powder-coated aluminium frames awaiting weaving


Powder-coated aluminium frames awaiting weaving. Raw-material checks catch what becomes a warranty claim: thin coating, wrong alloy, poor weld prep. Invisible in the finished product — until it isn't.

How we check it: Verify material specs against your requirements. Check coating thickness, material certificates, and storage conditions (rusty raw stock = rusty finished goods).

🚩 Red flag: No material certificates available, or the “stainless steel” is magnetic. (It happens more than you'd think.)

Cost of skipping: A product that passes visual inspection and fails in the field — six months of Australian sun and salt air will find every shortcut.

5. The loading check: the last 5% that causes 50% of damage

Shipping container being loaded with finished furniture


Container loading under supervision. Wrong carton count, bad stacking, no moisture protection — the last 5% of the job causes a disproportionate share of damage claims.

How we check it: Carton count vs. packing list. Stacking plan. Moisture protection. Container condition (holes, rust, smells). Photographed, documented, signed off.

🚩 Red flag: "Don't worry, our forwarder handles loading." Nobody you know watches it happen.

Cost of skipping: Perfect product, loaded badly, arrives broken — and a blame game between factory and forwarder where you pay either way.

The printable checklist

Here's the one-page version our team carries on every visit. Print it, or send it to whoever visits factories on your behalf:

TASMAN GLOBAL — FACTORY AUDIT CHECKLIST

☐ Business licence verified against national registry

☐ Registered address matches physical premises

☐ Export history / customs records confirmed

☐ Key production processes done in-house (list outsourced ones)

☐ Worker headcount supports my order quantity + timeline

☐ Golden sample selected, sealed, and photographed

☐ Mid-production inspection access agreed in writing

☐ AQL sampling plan agreed (Level II)

☐ Material certificates collected and match spec

☐ Raw-material storage inspected

☐ Packing list format agreed; carton markings specified

☐ Container loading supervision agreed (who watches, what they photograph)

⬇ Download the PDF checklist (email gate — name + email → PDF download)

Don't want to fly to Foshan?

That's what we're for. Our factory background check runs all five of these — business verification, capacity assessment, workmanship sampling, materials review, and loading supervision — with a written photo report in 5 business days.

Verify my factory →

Part 1 of this series: We Walked This Factory So You Don't Have To

Coming next: same process, different factory — inside a kitchen-appliance plant.